Heated Blower Adsorption Air Dryer

Contact Sollant Team

Contact below if you would like to get a reply quicker.

00865398555356

008618917517757

Regeneration gas volume: ≤0%
Working pressure: 0.6~1.0Mpa
Intake oil content: ≤0.1mg/m³
Pressure dew point: -20℃
Standard working cycle: 2~8 hours
Intake temperature: 0℃~45℃

Description

» Process features

  • Desorption in countercurrent in the adsorption direction using externally heated ambient air
  • Cooling with ambient air (partial vacuum cooling up to size 2750)
  • Designed for automatic continuous operation

» Features

Energy saving (zero purge, low desorption temperature)

Ultra-economical dew point control for improved energy efficiency

Dry gas/purge cooling on demand with reliable and stable dew point performance

High temperature resistant paint for long life corrosion and high temperature protection

Valve position control for reliable and safe operation

Alarm contacts and Ethernet communication interface for enhanced monitoring of system performance

Easy to maintain

» Features

Chemical and electrical industries

Machinery manufacturing and plant engineering/construction

Automotive industry

Glass production industry

Food and beverage industry

Technical Parameters